The Station Plaza
103 New build apartments. Hastings, East Sussex. We delivered all Electrical, Fire systems, Dampers, AOV and Mechanical heating. – An 18-month project.
Project Details

3nvision was awarded the package to carry out the electrical works for 103 new-build apartments. The scope included all electrical lighting, power, fire alarm systems, AOV systems, mechanical heating, and damper systems. This also included electrical distribution to both the apartments and communal areas.
The project was delivered within the desired 18-month timeframe. From the initial out of the groundwork, through to supporting tenants after occupation, this project demonstrates 3nvision’s promise to delivering both small, large and complex projects while maintaining a high level of service throughout.
Not only was the project delivered successfully, but as with any construction project, there were challenges along the way. Challenges that can often be detrimental to relationships; however, 3nvision views these situations as opportunities to strengthen relationships through transparency, commitment and problem-solving.
This project required complete focus over an 18-month period due to the complexity of the package and the regulatory requirements associated with buildings exceeding 18 metres in height, where electrical industry regulations become increasingly stringent.
The development is now home to 103 residents, and 3nvision is proud to have played such a vital role in its successful delivery.
What our customers say
A trusted team of innovative engineers covering London and the South of England
Related Projects
Speak to an Advisor
Tell us what you need, and we’ll help you understand the right next step.